Treatment Measures for Soft Subgrades

Soft subgrades can pose significant challenges to construction due to their low bearing capacity and susceptibility to deformation. Various treatment methods can be employed to improve the subgrade's stability and support construction activities.

Drainage and Drying of the Subgrade

This involves removing excess water from the subgrade to reduce its volume and increase its strength. This can be achieved through:

  • Surface drainage: Diverting surface water away from the subgrade using ditches, culverts, and slopes.

  • Subsurface drainage: Installing drainage systems such as French drains or gravel layers to remove groundwater.

  • Evaporation: Accelerating the evaporation process by using wind and sunlight.

Excavation and Replacement of Soft Material

This method involves removing the weak subgrade material and replacing it with a stronger, stable material such as gravel, crushed stone, or clean sand. The depth of excavation depends on the depth of the soft layer and the required bearing capacity.

Provision of a Gravel or Rock Fill Working Platform

A layer of gravel or rock fill is placed on the soft subgrade to distribute loads and provide a stable working platform. An impermeable capping layer is often added to prevent water infiltration and potential frost heave.

Stabilisation of the Top Layer of the Subgrade

Lime or cement can be mixed with the existing subgrade material to improve its strength, stiffness, and bearing capacity. The choice of stabiliser depends on the soil type and desired properties.

Provision of a Cemented Material Working Platform

A layer of concrete with a low cement content (lean-mix concrete) is placed on the subgrade to create a rigid working platform. This method is suitable for heavy loads and challenging ground conditions.

Provision of a Lean-Mix Concrete Working Platform

Similar to the previous method, but using a concrete mix with a lower water-cement ratio for increased strength.

Use of Geotextiles

Geotextiles are permeable fabrics placed between the subgrade and the overlying layers to separate and reinforce the materials, improve drainage, and prevent soil erosion.

Combination of Methods

In many cases, a combination of the above methods is required to achieve the desired subgrade improvement. The specific treatment depends on various factors, including soil conditions, climate, load requirements, and budget.

Key factors to consider when selecting a treatment method:

  • Soil type and properties: The type of soil, its moisture content, and plasticity index will influence the choice of treatment.

  • Load requirements: The expected traffic loads and the weight of construction equipment will determine the necessary subgrade strength.

  • Climate conditions: Rainfall, temperature, and frost susceptibility can affect the performance of the subgrade and the treatment method.

  • Cost: The cost of different treatment options varies significantly.

Conclusion

Improving soft subgrades is essential for ensuring the longevity and safety of construction projects. By selecting the appropriate treatment methods, such as drainage, excavation, stabilisation, and the use of geotextiles, construction professionals can address the challenges posed by soft subgrades and achieve a stable foundation for their projects. Each method offers distinct advantages and is suited to specific conditions, making it crucial to assess the unique requirements of each project. With careful planning and implementation, the stability and performance of soft subgrades can be significantly enhanced, paving the way for successful and durable construction outcomes.

Consult with a professional pavement engineer to assist you in the assessment of the subgrade and the design of your new pavement system.